top of page

Fast Fill Systems

Fast Fill Systems

2012-2014

Fast Fill Systems is one of the top developers of fluid-transfer systems for mining equipement. As an intern at this small company, I was given many opportunities to gain experience in several stages of the product development process. Among my responsibilities held and experience gained were: 

  • The design of several new products - everything from developing engineering models, creating solid models, protoyping, testing, tolerance analysis, generating engineering drawings, to design for manufacture.

  • The creation of SolidWorks document templates - for drawings and part files as well as for build sheets and other engineering documents.

  • The development of several SolidWorks Macros - a spring and o-ring generator, automatic insertion of our custom BOM, a thread creator, and more.

  • The development of a receiving book, the instructions for checking all incoming parts before inventoried.

  • CFD analysis using SolidWorks Flow Simulation.

 

© 2014 by Mike Morgan, Mechanical Engineer. Proudly created with Wix.com

  • Instagram B&W
  • LinkedIn B&W
  • Facebook B&W
bottom of page